[T]he report's executive summary certainly gets to the heart of their findings.

"The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs," says the report. "But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb."

you are viewing a single comment's thread
view the rest of the comments
[-] Resonosity@lemmy.world 9 points 5 months ago

I agree with all of this as an electrical engineer in the field. Base load is only base load because of the load profile of devices connected to the grid having either an on or off switch. Most of the time this means motors/HVACs, but the world of electronics is coming to that equipment just like how inverters have changed how we export solar PV and wind to the grid. VFDs, soft starters, and the like will make our industrial processes that much more efficient. We just need to spread awareness and ramp up implementation, just as much as for renewables themselves.

this post was submitted on 01 Jun 2024
385 points (97.5% liked)

Technology

59381 readers
2252 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS