1589
submitted 1 year ago by L4s@lemmy.world to c/technology@lemmy.world

First U.S. nuclear reactor built from scratch in decades enters commercial operation in Georgia::ATLANTA — A new reactor at a nuclear power plant in Georgia has entered commercial operation, becoming the first new American reactor built from scratch in decades.

you are viewing a single comment's thread
view the rest of the comments
[-] kameecoding@lemmy.world 3 points 1 year ago

last time I checked the renewables being installed didn't even offset the new energy demands being created, let alone making a dent in starting to decarbonize existing demand.

and the main reason is, that we need to tackle climate change from as many angles as possible and not eliminate a fine energy source just because something else is cheaper.

I mean for now renewables are cheaper, do you think we have enough raw materials to cover all of earths energy needs?

what happens when the raw materials will start to run dry but we still need to cover a bunch of energy needs, is that when we dust off the good ol Nuclear plants?

not to mention Nuclear plants provide a stable base load, no need for smart electronic devices that use power when it's most abundant etc. it's just power, that runs, constantly.

this post was submitted on 01 Aug 2023
1589 points (98.1% liked)

Technology

59414 readers
1156 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS