134
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
this post was submitted on 08 Aug 2023
134 points (91.9% liked)
Technology
59454 readers
1933 users here now
This is a most excellent place for technology news and articles.
Our Rules
- Follow the lemmy.world rules.
- Only tech related content.
- Be excellent to each another!
- Mod approved content bots can post up to 10 articles per day.
- Threads asking for personal tech support may be deleted.
- Politics threads may be removed.
- No memes allowed as posts, OK to post as comments.
- Only approved bots from the list below, to ask if your bot can be added please contact us.
- Check for duplicates before posting, duplicates may be removed
Approved Bots
founded 1 year ago
MODERATORS
It might have been why in the past, but the issues right now with building new plants is getting a design through production that can survive the review process. Costs come down on the second plant because you have a design you can clone rather than developing it from scratch.
There are already several uses by several countries in using miniature nuclear power plants. This is just an attempt to make it more available to everyone.
Nuclear has never been competitive in terms of cost against the alternatives, first coal and gas, now renewables. In fact, nuclear is only getting more expensive. I really don't understand why you want to pay more for power than is necessary. I don't.
We need to compare the cost of nuclear against firm renewables, including storage (developing technology) and long-distance transmission (location-dependent political/technical challenges).
Comparing against coal and gas is meaningless unless we include the atmospheric cleanup costs.
In places where this has been studied extensively renewables with storage are still the cheapest by a long way. Australia has the whole state of South Australia (plus Tasmania) as a test case. SA has transitioned to almost 100% renewable supply in under a decade.
We have a cost effective, distributed, redundant, easy to build solution. SMRs are not proven in cost or reliability. They should be studied and trialed, but not at the expense of acting responsibly today.