610
submitted 1 year ago by lntl@lemmy.ml to c/worldnews@lemmy.ml

German energy giant RWE has begun dismantling a wind farm to make way for a further expansion of an open-pit lignite coal mine in the western region of North Rhine Westphalia.

I thought renewables were cheaper than coal. How is this possible?

you are viewing a single comment's thread
view the rest of the comments
[-] suction@lemmy.world 3 points 1 year ago

Do you believe every headline you read on the internet? Looks like it. This isn’t „Germany end all wind farms“, the people who wrote that headline want you to think that. Don’t be such an easy mark.

[-] moormaan@lemmy.ca 1 points 1 year ago* (last edited 1 year ago)

The title, paired with an expensive paywall and the fact that the quote below is the only part visible for free would certainly suggest that this comment is true.

Here's the un-paywalled article intro:

"German energy giant RWE has begun dismantling a wind farm to make way for a further expansion of an open-pit lignite coal mine in the western region of North Rhine Westphalia.

One wind turbine has already been dismantled, with a further seven scheduled for removal to excavate an additional 15m to 20m tonnes of so-called 'brown' coal, the most polluting energy source."

I think this article from last year is relevant to this story: https://www.theguardian.com/world/2022/oct/26/german-windfarm-coalmine-keyenberg-turbines-climate

[-] suction@lemmy.world 2 points 1 year ago

What I’m saying is RWE is a privately owned company. The headline says „Germany begins…“ which is objectively untrue.

It is trying to suggest that Germany passed a decree to disassemble all windfarms. Yet the opposite is true.

[-] moormaan@lemmy.ca 2 points 1 year ago* (last edited 1 year ago)

I agree, that's what I'm saying. I used "this" ambiguously, I just realized. I edited "this" to "this comment", and added another clarifying sentence before the quote.

Here's an excerpt from the older article which isn't paywalled, that I linked in my comment (before the edit):

"Constructed more than 20 years ago, the turbines at the small Keyenberg wind park are less powerful than modern equivalents, with each producing about 1MW of energy per hour at a wind speed of 15 metres per second, roughly a sixth of the output of a more efficient state of the art turbine.

Since windfarms in Germany are no longer eligible for subsidies after 20 years in operation, the park would probably have been “repowered” with new technology or wound down even if it were not for the nearby mine.

Nonetheless, North-Rhine Westphalia’s ministry for economic and energy affairs on Monday urged RWE to abort its plans to dismantle the windfarm.

“In the current situation, all potential for the use of renewable energy should be exhausted as much as possible and existing turbines should be in operation for as long as possible,” a spokesperson said."

[-] suction@lemmy.world 1 points 1 year ago
this post was submitted on 31 Aug 2023
610 points (82.8% liked)

World News

32323 readers
865 users here now

News from around the world!

Rules:

founded 5 years ago
MODERATORS