344
submitted 10 months ago by L4s@lemmy.world to c/technology@lemmy.world

Boeing Whistleblower: Production Line Has “Enormous Volume Of Defects” Bolts On MAX 9 Weren’t Installed::A reader at respected airline industry site Leeham News offered a comment that suggests they have access to Boeing’s internal quality control systems, and shares details of what they saw regarding the Boeing 737 MAX 9 flown by Alaska Airlines that had a door plug detach inflight, causing rapid decompression of the aircraft. The takeaway appears to be that outsourced plane components have so many problems when they show up at the production line that Boeing’s quality control staff can’t keep up with them all.

you are viewing a single comment's thread
view the rest of the comments
[-] yesman@lemmy.world 11 points 10 months ago

People who know more than me have pointed out that the the hole in the fuselage and the plug found on the ground don't show the kind of damage you'd expect if the bolts were present and secure.

So them being absent entirely is consistent with the publicly available evidence.

this post was submitted on 25 Jan 2024
344 points (98.3% liked)

Technology

59708 readers
1536 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS