[-] glimse@lemmy.world 21 points 7 months ago

I doubt these are custom but I otherwise agree with you, though. I've decommed quite a few racks and the fastest way is to cut everything! Not worth the time to try to save everything because you're most likely not reusing those patch cables

[-] Aermis@lemmy.world 9 points 7 months ago

Yeah definitely not custom length, you're not running fire alarm cabling with addressible NAC devices that needs specific resistances.

But the decommission is correct. Pulling the cable out the Jack's need to be cut.