1546
Death by PowerPoint [Work Chronicles]
(lemmy.world)
Comic Strips is a community for those who love comic stories.
The rules are simple:
Web of links
Critical Design Review. In aerospace engineering, it happens when drawings and software are substantially complete, but before starting to cut metal. The goal is to provide some assurance that the design will actually comply with the system requirements.
CDRs are usually presented as a single PowerPoint deck that can run to thousands of slides, with many presenters and dozens of review panel members.
Interesting! I operate fully outside of the realm of aerospace engineering, so this is news to me. I take it this is an opportunity for anyone to speak up if they have any concerns with any aspect of the design before it moves to the production phase?
Exactly so.