704
submitted 5 months ago* (last edited 5 months ago) by Gsus4@programming.dev to c/technology@lemmy.world

Abstract from the paper in the article:

https://agupubs.onlinelibrary.wiley.com/doi/10.1029/2024GL109280

Large constellations of small satellites will significantly increase the number of objects orbiting the Earth. Satellites burn up at the end of service life during reentry, generating aluminum oxides as the main byproduct. These are known catalysts for chlorine activation that depletes ozone in the stratosphere. We present the first atomic-scale molecular dynamics simulation study to resolve the oxidation process of the satellite's aluminum structure during mesospheric reentry, and investigate the ozone depletion potential from aluminum oxides. We find that the demise of a typical 250-kg satellite can generate around 30 kg of aluminum oxide nanoparticles, which may endure for decades in the atmosphere. Aluminum oxide compounds generated by the entire population of satellites reentering the atmosphere in 2022 are estimated at around 17 metric tons. Reentry scenarios involving mega-constellations point to over 360 metric tons of aluminum oxide compounds per year, which can lead to significant ozone depletion.

PS: wooden satellites can help mitigate this https://www.nature.com/articles/d41586-024-01456-z

you are viewing a single comment's thread
view the rest of the comments
[-] Corkyskog@sh.itjust.works 10 points 5 months ago

They should just pay people to lay the cable directly instead of awarding it programmatically to companies.

[-] sugar_in_your_tea@sh.itjust.works 4 points 5 months ago

That's what my city is basically doing. They're contracting with a local installer to lay cable, then selling service on that network. No money is being awarded, in fact the contract states that they get paid with part of the subscription fee, so they are motivated to get people connected quickly so they can start collecting. The city owns the network and ISPs compete over customers on that network. They claim it'll take 2 years for everyone to be connected, which is pretty quick (but the proof is in the pudding).

Seems like a decent system to me. We're being promised 10gbps available, but pricing details aren't finalized yet (and my router only handles 1gbps anyway, and I'm too lazy and cheap to upgrade everything).

AFAIK, this plan was in the works before the infrastructure bill was passed, so I don't think we're taking money from that, but I could be wrong.

this post was submitted on 17 Jun 2024
704 points (95.8% liked)

Technology

59366 readers
1272 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS