249
Switzerland authorizes removable PV plant on railway track
(www.pv-magazine.com)
This is a most excellent place for technology news and articles.
That's not much of a pilot. I run 43kW at my house.
The capacity limit of the system is not the objective of the pilot project.
It cost 600k euros