94
you are viewing a single comment's thread
view the rest of the comments
[-] partial_accumen@lemmy.world 2 points 1 day ago

Are the largest power consumption steps of semi conductor product happening 24/7? Could we simply align manufacturing times with useful solar production times? So no need to store all the solar power, with the idea of consuming most of it immediately for manufacturing. Then pass a run that Semi conductor fabs have to build out their own solar arrays to cover most of their power consumption.

[-] Kidplayer_666@lemm.ee 3 points 1 day ago

Chances are yes. Simply because to build the machines, such an astronomical amount of money and energy is needed to build them, that even if electricity during dead times cost a bunch more (which for businesses probably does), it probably is still worth it, just to bring it to maximum capacity

this post was submitted on 30 Oct 2024
94 points (86.7% liked)

Technology

59020 readers
4153 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS