4

Summary:

  • A massive flood on the Lende River on the morning of July 8, 2025, washed away the Nepal-China Friendship Bridge at the Rasuwagadhi border point in Rasuwa district.
  • Several newly imported electric vehicles (EVs) parked at the dry port were also swept away by the flood.
  • The flood caused heavy damage, and some individuals, including security personnel, were trapped but have been rescued.
  • Authorities warned residents downstream to move to safer areas due to the risk of further flooding and possible people trapped inside vehicles.
  • Rasuwagadhi is a key trade gateway between Nepal and China, and the damage has severely affected this route.
  • The Nepal Army has been mobilized for rescue operations, and a helicopter was called in, but adverse weather delayed its arrival.
  • Rescue efforts are ongoing amid bad weather conditions.

This incident has disrupted trade and caused significant damage at a crucial border crossing.

Archive: https://archive.md/PxnOC

no comments (yet)
sorted by: hot top controversial new old
there doesn't seem to be anything here
this post was submitted on 08 Jul 2025
4 points (100.0% liked)

Nepal

9 readers
23 users here now

A place to discuss topics relating to Nepali community. Not bound by politics in either direction.

For a better, secular, greener, progressive, sustainable, inclusive and self dependent Nepal.

Rules

Quick Links

The Golden Rules

Private Frontends

App Frontend
YouTube Invidious
Reddit Redlib

FOSS Alternatives

App Alternative
WhatsApp Signal
Discord Revolt

founded 1 month ago
MODERATORS