104
submitted 1 year ago by L4s@lemmy.world to c/technology@lemmy.world

Millions of smart meters will brick it when 2G and 3G turns off::Public Accounts Committee demands timetable for replacements, because things have run so smoothly so far...

top 11 comments
sorted by: hot top controversial new old
[-] DarkwinDuck@feddit.de 40 points 1 year ago

Honestly, I work for an iot Mobile network provider, the amount of devices that will brick if 2G will be turned off is massive. Especially the cheaper ones that only have 2G/3G modems on board. And not only are they the most likely to brick, but also the most unlikely to be fixed.

[-] agitatedpotato@lemmy.dbzer0.com 27 points 1 year ago* (last edited 1 year ago)

Those bands have great uses too imo, further range than 5g, great for beacons, telemetry, low bandwidth send and recieve. Could be really useful and the only upside of discontinuatuon is maybe they'll let me and the other amateur radio operators play around on segments of those bands eventually. All the stuff you kick off the 2/3g networks will need to be updated and start clogging the 5g bands. Needless traffic on frequencies that could be reserved for denser traffic. Im sure profits will rise slightly for maybe a year or two though, so clearly a worthwhile decision.

[-] Pasta4u@lemmy.world 8 points 1 year ago

They aren't going to disallow the usage. They are just going to stop using the old hardware and deploy new generations of hardware on that frequency

[-] SmashingSquid@notyour.rodeo 7 points 1 year ago

There aren’t “5g bands”. The reason they shut down 2g/3g is to reuse the spectrum for 5g.

[-] spauldo@lemmy.ml 23 points 1 year ago

I see this sort of thing all the time.

There's a disconnect between the time scales for industrial equipment and the time scales for IT and telecommunications. A PLC running a factory might last 30 years, but the software to program and troubleshoot it won't run on modern operating systems or computers. The company doesn't want to spend hundreds of thousands of dollars to upgrade it when there's nothing wrong with it.

Same with telecommunications - POTS worked for a century, and over the last decade we've seen it largely disappear, which makes fire alarm panels everywhere inoperative. We recently ran into an issue where a fire marshall refused to allow anything but POTS and all of the non-end-of-life hardware only supported IP.

[-] Kecessa@sh.itjust.works 4 points 1 year ago* (last edited 1 year ago)

For those like me who don't know

https://en.m.wikipedia.org/wiki/Plain_old_telephone_service

Also it's pretty ridiculous to have fire alarm systems be dependent on electricity and Internet...

[-] spauldo@lemmy.ml 2 points 1 year ago

It's difficult to eliminate the use of electricity, although generally you'd have them on a battery backup.

Internet is required to contact the fire department or other emergency center (these panels tend to do more than just fire). Used to be just phone lines using a touch tone code, but phone lines are going away. They're pushing hard for cloud solutions now for security panels - I imagine fire will go that way soon enough.

[-] alphacyberranger@lemmy.world 16 points 1 year ago
[-] JoShmoe@ani.social 3 points 1 year ago

They should have thought about this before they became exclusive to 2G and 3G

[-] autotldr@lemmings.world 9 points 1 year ago

This is the best summary I could come up with:


The report echoes an earlier one by the National Audit Office (NAO), which found that as of March 2023, energy companies had rolled out the devices to just 57 percent (roughly 32.4 million out of a potential install base of 57.1 million) homes and businesses.

It asks both to set out "what they will do to ensure suppliers assign more importance than at present to replacing those smart meters not functioning properly" and "a timetable for replacing the communication hub element of smart meters that will lose functionality when the 2G and 3G mobile networks are switched off."

It is hardly surprising the PAC, which studies public audits such as those written by the NAO, is concerned about deadlines because the smart meter project has missed plenty so far.

The scheme started in 2012 when government placed the legal burden on energy suppliers to ensure they'd complete the smart meter rollout by 2019.

The PAC also want DESNZ and Ofgem to outline "measures to ensure that suppliers use future-proofed technology – for example, by excluding 2G or 3G connectivity – in all new smart meter installations."

And it wants the department and the energy watchdog to detail program costs to Parliament on an annual basis to inform decisions about the rollout.


The original article contains 495 words, the summary contains 211 words. Saved 57%. I'm a bot and I'm open source!

[-] Toes@ani.social 1 points 1 year ago

Is the primary reason 2g is insecure and 3g has phat channels?

this post was submitted on 24 Oct 2023
104 points (94.8% liked)

Technology

59144 readers
2645 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS