17
submitted 2 weeks ago by mistermodal@lemmy.ml to c/green@lemmy.ml

Located about 70 kilometers offshore with a water depth ranging from 52 to 56 meters, the 504-MW project adopts an innovative four-pile jacket foundation structure, with the tallest reaching 83.9 meters—the highest of its kind in the country. It is expected to generate approximately 1.7 billion kWh of electricity annually, saving around 500,000 tonnes of standard coal each year.

top 3 comments
sorted by: hot top controversial new old
[-] ragica@lemmy.ml 2 points 2 weeks ago

XCancel link not working currently (bad gateway). Alternate source:

https://www.globaltimes.cn/page/202604/1358271.shtml?id=12

[-] mistermodal@lemmy.ml 1 points 2 weeks ago

Yeah I noticed issues with it too. I hope my lazy ass embedding their images isn't a problem. I do donate, as with most FOSS services!

[-] sodium_nitride@hexbear.net 1 points 2 weeks ago* (last edited 2 weeks ago)

To put nunbers into context

If a barrel of oil is taken as about 6 gigajoules, then this project is estimated to produce about 2800 barrels of oil a day of energy.

As I on worldometer, China consumes about 16.4 million barrels of oil a day.

this post was submitted on 07 Apr 2026
17 points (100.0% liked)

Green - An environmentalist community

6435 readers
61 users here now

This is the place to discuss environmentalism, preservation, direct action and anything related to it!


RULES:

1- Remember the human

2- Link posts should come from a reputable source

3- All opinions are allowed but discussion must be in good faith


Related communities:


Unofficial Chat rooms:

founded 7 years ago
MODERATORS