8
submitted 1 year ago* (last edited 1 year ago) by cendawanita to c/transport

I haven't been to Penang in years but this entire walking video is such an indictment weh. (ETA: adding hashtags, to see if it gets fetched) #TootSEA #MYToots

top 9 comments
sorted by: hot top controversial new old
[-] cendawanita 3 points 1 year ago

Also the comment section damn nice 🥹 I think when the subculture isn't a cytro-infested space the convos are actually great

[-] penangkia 3 points 1 year ago

Cool news! One of my favourite urbanism YouTube channels picked up this video and shared it. Congrats to Malaysian YouTuber 💪

Now if only Anthony Loke will do something about this.

[-] cendawanita 1 points 1 year ago

Well if it doesn't get coverage on Says then maybe not (and maybe it won't get coverage because it isn't a white dude marvelling at our country lmao)

[-] penangkia 2 points 1 year ago

This is genius. In a mirror universe.

[-] AwesomeSteve 2 points 1 year ago* (last edited 1 year ago)

Let's take a look at the background of this project [1].

Project announced in 2007 during former PM Badawi administration, opened on 2018, after 11 years since the announcement.
Modeled after KL Sentral in Kuala Lumpur.
The entire project was divided into eight phases, of which the second, third and fourth phases comprised a shopping complex, three office blocks and a 36-storey hotel respectively.
Project awarded to Malaysian Resources Corporation Berhad (MRCB) and Perlaburan Hartanah Bumiputera Berhad.
**Veritas Architects was put in charge of the design works. **

3 major pieces:
Main building is owned by MRCB.
Butterworth station is owned by KTMB.
Ferry Terminal is owned by Prasarana.

The project suffered repeated delays. Land acquisition became the main stumbling block, as the parcels of land earmarked for the development were owned by several parties, namely the Malaysian federal government, the Penang state government, highway concessionaires and Keretapi Tanah Melayu, the national railway operator. As a result, construction of Phase 1 of Penang Sentral only began in earnest in 2015.

I can see why the delay and disconnect or even disagreement on the entire design but the decision maker could possibly went ahead and all stake holders worked in silos. Penang state government and the federal government has always been on disagreement, just see the unnecessary second bridge that nobody uses.

I looked up Veritas Design Group at Linkedin, select the 'People' tab, and scroll to the right and look at 'Where they studied' [2]. What do you think, is that 'that bad' ?

[1] https://en.wikipedia.org/wiki/Penang_Sentral
[2] https://www.linkedin.com/company/veritas-design-group/people/

[-] ruk_n_rul 0 points 1 year ago

Oh, you got this suggestion on YouTube as well? I was itching to post but I held back. 😬

[-] cendawanita 1 points 1 year ago

Yah, and I succumbed, lawl

[-] DerpyPoint@lemmy.world 1 points 1 year ago

There's no need to hold back! Everyone needs to know the glaring flaws of this TOD.

[-] imademo 1 points 1 year ago

Funny. I got this video suggested on my feed today too

this post was submitted on 19 Jul 2023
8 points (100.0% liked)

Transportation

143 readers
2 users here now

Everything about transportation in Malaysia.

founded 2 years ago
MODERATORS